Australian Coal Project analysis: Project risk, NPV, certainty-equivalent approach

The Australian Coal Exploration Company

On March 1, 2001, the Australian Coal Exploration Company was investigating the feasibility of two mutually exclusive investment projects. The first prospective investment involved a strip (open-cut) mining operation in western New South Wales. The second investment also involved the extraction of coal, but this expenditure would be an underground site in south-eastern Victoria. Preliminary drilling, sampling and analysis of both sites and consultation with geologists, costing the company $240,000, suggested that both sites have similar coal reserves and useful lives.

The coal extraction process for the two types of mines and the equipment required for operation of the mines are very different, however, with the underground mining operation expected to be more complex and difficult. The process of drilling underground also increases the dangers faced by employees, although it is more environmentally friendly than the pollution and soil erosion caused by open-cut mining operations.

For the past several months, John McPhee has been involved in the development of revenue and expense projections for the two projects. In his analysis, sufficient data existed from prior investments to provide relatively accurate cost data. After having drawn upon this information, McPhee made the following projections as to investment costs for each operation:

Strip Mining Underground Mining
Equipment $3,000,000 $1,750,000
Additional working capital requirements 200,000 200,000
Total $3,200,000 $1,950,000

With respect to these figures, experience suggests that a 10-year life may be expected on either of the two prospective investments, with the practice being to depreciate the equipment on a prime-cost (straight-line) basis over the life of the projects. Both sites have no alternative productive use for the company, although the land in New South Wales and Victoria could be sold now for $400,000 and $300,000 respectively as grazing land for farming. The projected salvage value for the strip mining operation would be $600,000 at project end, while the equipment for the underground plant could be expected to have a residual value of $150,000. The working capital requirement would arise at the time of the investment, but could be released upon the termination of the project with only a negligible chance of the full amount not being recovered.

In addition to the cost estimates, the engineers, based upon studies of the subsurface formations, were able to make projections as to the revenues that could be generated from the two fields. As a result of their studies, expected earnings after taxes for the two investments would be as follows:

Years Annual expected earnings after taxes
Strip mining 1-4 $400,000
5-7 $220,000
8-10 $100,000
Underground mining 1-4 $360,000
5-7 $230,000
8-10 $130,000

Upon receiving this information, McPhee questioned the reliability of the anticipated earnings. In response, Tony Hughes, head of the engineering staff at the Australian Coal Exploration Company, informed him that both projects would have to be considered to be more risky than the firm’s typical investment. The analysis indicated that the expected cash flows from the underground mining operation were subject to considerably more uncertainty than those from the strip mining project. In fact, Hughes considered the extraction of coal through the underground facility to be twice as risky as that of the strip-mining alternative. For this reason, he recommended that the strip-mining project be discounted at a 10 per cent rate, while the underground mining proposal be analysed with a 20 per cent criterion. McPhee questioned Hughes’ logic, in that the company’s cost of capital had been computed to be 8 per cent. He believed that this figure better reflected the shareholders’ required rate of return and for that reason should be used as the discount rate for both projects.

In support of his position concerning the riskiness of the two proposed investments, Hughes developed some in-depth worksheets for McPhee that suggested other possible returns depending upon the amount of coal actually extracted from the mines. These calculations of the standard deviations from the expected value of earnings are as follows:

Years Standard deviation of earnings after taxes
Strip Mining 1-4 $360,000
5-7 $242,000
8-10 $190,000
Underground Mining 1-4 $324,000
5-7 $276,000
8-10 $234,000

In addition to the standard deviation of these reported earnings, engineering personnel estimated the standard deviation relating to the salvage value to be $300,000 for the strip mining facility and $135,000 for the underground mining equipment.

In reviewing the engineering department’s work, John McPhee was quite pleased with the results. However, a question remained in his mind as to the soundness of employing the various discount rates, as suggested by Hughes. As an alternative to adjusting the discount rate for projects with dissimilar risks, he had been conducting informal discussions with top management trying to establish the relationship between the level of risk and the willingness of management to accept such uncertainty, as reflected by ‘certainty-equivalent factors’. The results of these meetings are depicted in Exhibit 1 below.

Exhibit 1: Management’s risk-return profile
Coefficient of variation (CV)* Certainty-equivalent factor
0.50 0.95
0.60 0.93
0.70 0.91
0.80 0.88
0.90 0.85
1.00 0.82
1.10 0.78
1.20 0.74
1.30 0.70
1.40 0.64
1.50 0.58
1.60 0.52
1.70 0.43
1.80 0.33
1.90 0.15
*

He felt that a better approach would be to adjust the cash flows by the appropriate certainty-equivalent factor and to discount these adjusted cash flows at the firm’s cost of capital. However, Hughes is of the opinion that the risk-free rate, which is currently 6 per cent, would be more appropriate for such analysis.

At this point, the investigation has been temporarily halted until these outstanding questions have been resolved.

Required:

1) Consider the arguments of John McPhee and Tony Hughes regarding how the risk of these two projects should be measured and incorporated into the investment evaluation process. Are both of them technically correct in the methods they suggest to account for project risk, and which method of risk-adjustment do you think should be applied in evaluating the feasibility of these two projects?

2) Calculate the net present value for each investment employing (i) the certainty-equivalent approach and (ii) the risk-adjusted rate of return method. Assume that the company faces a marginal corporate tax rate of 30 per cent on earnings and other cash flows. Using these calculations, provide a recommendation to the company as to which project the firm should accept. If an inconsistency between the results of the various capital budgeting techniques does exist, explain the reason(s) why.

3) Outline any other factors that you think the Australian Coal Exploration Company should consider prior to making its final decision on these projects, and whether, in your opinion, any of these factors warrant acceptance of one project over another, independent of financial concerns.

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with AssignmentHelpWeb
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
English 101
Very good job. I actually got an A
Customer 452443, September 25th, 2022
Business Studies
Excellent service - thank you!
Customer 452469, February 20th, 2023
Business Studies
Thank you!
Customer 452451, November 27th, 2022
Anthropology
excellent loved the services
Customer 452443, September 23rd, 2022
Business Studies
Job well done. Finish paper faster than expected. Thank you!
Customer 452451, October 3rd, 2022
Theology
Job well done and completed in a timely fashioned!
Customer 452451, November 18th, 2022
Architecture, Building and Planning
The assignment was well written and the paper was delivered on time. I really enjoyed your services.
Customer 452441, September 23rd, 2022
Anthropology
Excellent services will definitely come back
Customer 452441, September 23rd, 2022
Psychology
Thanks a lot the paper was excellent
Customer 452453, October 26th, 2022
Nursing
The paper was EXCELLENT. Thank you
Customer 452449, September 23rd, 2022
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat